Recent Proteus Industrial Case Study
Following the recent works at Huntershill Sports Centre, Moffat Electrical Services were highlighted in a recent Proteus case study. Moffat Electrical Services Ltd proposed Proteus Industrial Switchgear to electrical consultants Atkins Global UK for the incoming mains supply. The installation consisted of various wall mounting IP3X distribution boards, split load boards and MCCB panel boards, fully fitted with devices, surge protection and metering.
The direct dialogue with the installation contractors established the exact requirements and meant that each board was purpose-made to their exact specifications. The boards then arrived on site fully assembled saving valuable time to the installing engineers. Alan Hay, Estimating Director of the Moffat Group said “We have used Proteus over many years and do so whenever we can. Having the units pre-built at the factory was a great time saver and allowed us to complete all the quicker”.
Click here for more information on the Proteus products used and also to view the case study in full.